Electrical Component Assembly Facility

Inyantra Technologies Pvt. Ltd.

This facility was designed to support the assembly of electrical circuits and components, serving as a modern extension to the existing factory operations of Volex India Pvt. Ltd. The project focused on integrating a new building seamlessly with the existing RCC structures, ensuring operational continuity while achieving architectural cohesion. The facility emphasizes efficient assembly workflows, clear circulation, and safety, while meeting an aggressive construction timeline of just 3 months.
Design Intent & Architectural Approach
The design approach prioritized compatibility, speed, and functional efficiency:
  • The new building matches the architectural language and structural characteristics of the existing RCC factory.
  • Layout is optimized for assembly lines, material handling, and operational safety.
  • Façade and finishes are restrained and functional, blending with the industrial identity of the existing premises.

Planning & Functional Strategy

Service Image
  • Logical separation of assembly zones, support areas, and storage
  • Clear paths for personnel movement and material transfer
  • Integration of power, water, and utility systems for uninterrupted operations</li>
  • Efficient layout supporting heavy electrical equipment and machinery
  • Built for fast-track construction and operational readiness within 3 months
Key Design Considerations
  • Integration with Existing Factory: Seamless connection with operational RCC building
  • Speed of Execution: Complete construction and commissioning in 3 months</li>
  • Operational Efficiency: Workflow-optimized layout for assembly lines
  • Safety & Compliance: Adherence to industrial safety norms and clear circulation</li>
  • Future Adaptability: Potential to expand or modify assembly lines as needed
Service Image
Project Challenges & Solutions
  • Integration Challenge: Designing a new facility that connects to an existing, fully operational factory. Solution: Structural and aesthetic alignment with the RCC factory ensured visual and functional cohesion.
  • Time Constraint: Completion required within 3 months. Solution: Pre-fabricated elements, streamlined workflows, and disciplined project management enabled on-time delivery without compromising quality.

Project Outcome

The completed facility provides a high-performance assembly environment for electrical components, seamlessly integrated with the existing factory operations. It reflects Axiom Design’s expertise in fast-track industrial projects, workflow-driven planning, and functional architectural design, while maintaining safety, operational efficiency, and structural harmony.

Project Information

  • Client : Inyantra Technologies Pvt. Ltd.
  • Built-up Area: 12,000 sq ft
  • Project Cost: ₹2.65 Cr
  • Year Completed: 2023
  • Location: Shirwal, Satara, Maharashtra